CLEVELAND, OHIO
Higley Construction is serving as Construction Manager at Risk for the $100 Million additions and renovations to the Cleveland Metroparks Zoo Rainforest building. This re-imagining of the Rainforest will create a new world-class Gorilla exhibit, expand the Orangutan exhibit, upgrade food service, and renovate other features of the facility. The project will also include updates to driveways and parking, pedestrian walkways, ticketing, gift shop, and other spaces to redefine the entrance to the Zoo. The project is being completed in multiple phases over the next several years. Higley has collaborated closely with the Design Team and Zoo Executive Team to provide project planning and estimating support throughout a 4-year preconstruction phase. New structures are primarily structural steel and concrete support by drilled pier foundations, a mix of masonry and glass facades, and both ETFE and membrane roofing. Complex mechanical systems are designed to maintain temperature and humidity to balance the needs of guests, animals and plantings, and require coordination within the forest environment. Higley is responsible for all aspects of the project, including containment systems, themework, landscaping, food service, technology, AV, and interpretive exhibit fabrication and integration.
Starting in September 2024, the first phase of construction includes demolition of the existing cascading curtainwall that encapsulates the south and west facades of the building. A new 40,000 SF building expansion will include a new entrance atrium that will immerse visitors into an interactive forest environment, new food service and retail gift shop, new forest interpretive spaces designed by exhibition design firm Local Projects, new children’s play space and flex rooms. A new Orangutan Day Room provides indoor space connected to a new 3,500 SF outdoor yard featuring multi-level climbing structures and enrichment features with both ground level and elevated guest viewing.
While the Rainforest is closed to guests for the expansion, renovations to existing exhibits, finishes, lighting, HVAC, and other building systems will be performed. This work will be coordinated so that animals and keeper staff can continue to occupy the existing spaces. At the end of this phase, the building will be reopened to the public.
Following Phase 1, a new 22,000 SF high-volume forest will be constructed, which will feature a series of interconnected netted gorilla yards and management hubs that are designed to allow zoo staff to care for multiple gorilla troops within the environment, allowing Gorillas to remain in the Forest 24-hours a day. The ETFE roof spanning the Forest will allow the forest to be heavily planted, and guest paths will wind through the forest providing viewing from multiple elevations. A 2,500 SF outdoor yard and an 8,700 SF holding building are attached, as well as space for significant mechanical and electrical infrastructure to support the Forest and Holding spaces.
This phase will be constructed while the existing Rainforest and Phase 1 expansion are open to the public. Following completion, the Cleveland Zoo Gorilla Troops will relocate from their existing home in the Primate, Cats, and Aquatics building to the new Primate Forest.